| key |
id |
string(36)* |
= |
Unique identifier of data center quarterly updated metadata |
| timeline |
quarterEndDate |
date* |
=< >= |
Ending date of the quarter, standardized to be the last day of the month in which the quarter ends. |
|
aiDatacenterType |
string(30) |
|
An AI Datacenter Type is a classification that describes how a data center is built, equipped, and operated specifically for artificial intelligence (AI) workloads. |
| link |
aiDatacenterTypeId |
AIDatacenterType |
|
Unique identifier for AI data center Type |
|
annualPowerDraw |
decimal{10,4} |
|
How much power the facility is likely to draw from the utility annually in kilowatts (kW). This is estimated using the amount of IT equipment, its utilization and the extra power required for cooling (from the PUE) |
| link |
batch |
Batch* |
= |
The batch that provided the data |
| link |
batchRun |
BatchRun* |
= |
The batchRun that provided the data |
|
dCPropertiesPeriodicId |
long(-9223372036854775807,9223372036854775806)* |
|
Unique identifier of data center quarterly updated metadata |
|
dataCenterName |
string(50) |
|
The name of the data center facility. |
|
estimatedRevenue |
decimal{10,4} |
|
Estimated revenue earned from the data center (utilized racks x estimated price per rack), in annualized ($M) millions of USD. |
|
existingFacilitySpace |
boolean |
|
Indicates that the data center can be expanded within the current building. |
|
grossBuildingSpace |
decimal{13,4} |
|
Gross area of the data center building, including offices, common areas, mechanical and electrical rooms denoted in square feet (sq. ft). |
|
isParent |
boolean |
|
Denotes whether the data center is within another data center (leasing space from a "parent" provider) |
|
itUtilizationAssumption |
decimal{10,4} |
|
Estimate of how much of the IT power will be utilized by the IT equipment, in kilowatts (kW) - used to estimate the overall power draw of the facility |
|
kilowattsPerRack |
decimal{10,4} |
|
The average IT power capacity available per rack, calculated by dividing the total IT power by the total number of racks. |
|
landToExpand |
boolean |
|
Indicates that the data center has additional land available for future physical expansion. |
|
liquidCoolingReady |
boolean |
|
Denotes when a data center facility can be equipped with liquid cooling for high-density applications (such as AI). |
|
netITPower |
decimal{10,4} |
|
Net UPS power in a facility in kW (kilowatts). Excludes UPS power leased by a colocation provider in a facility. For example, if data center X has a facility with 1,000 kW and leases half to a colocation provider that offers 500 kW to clients, the first provider would have 500 net kW, as would the second. |
|
netITPowerAllocated |
decimal{10,4} |
|
Net UPS power being rented or leased to clients, in kW (kilowatts). Does not count UPS power leased by other colocation providers in a given facility. |
|
netITSpace |
decimal{12,4} |
|
Area of the facility in square feet (sq. ft.), without double counting. This excludes square footage leased by a colocation provider in a facility. For example, if data center X has a facility with 100,000 sq. ft and leases 60% to a colocation provider that offers 60,000 sq. ft to clients, the first provider would have 40,000 net sq. ft. |
|
netITSpaceOccupied |
decimal{12,4} |
|
Value of net operational space being rented or leased by clients, in square feet(sq. ft.). Does not count space leased by colocation providers in a given facility. |
|
netRacks |
long(0,99999999) |
|
Actual number of racks in a facility, without double counting. (Excludes racks leased by a colocation provider in a facility. For example, if data center X has a facility with 1,000 racks and leases half to a colocation provider that offers 500 racks to clients, the first provider would have 500 net racks, as would the second.). |
|
netRacksOccupied |
long(0,99999999) |
|
Actual number of net racks being rented or leased by clients. Does not count racks leased by other colocation providers. |
|
operationalStatus |
string(20) |
|
Operational status of the data center. For example, Operational, Under Construction, Land Held, Planned, Not Operational. |
| link |
operationalStatusId |
OperationalStatus |
|
Unique identifier of data center Operating Status |
| link |
parentPropertyUniqueId |
DCProperties |
|
Unique identifier for real estate properties of parent data center property. |
|
powerUsageEffectiveness |
decimal{10,4} |
|
Power Usage Effectiveness (PUE) is a ratio that describes total energy used to run the data center, or the energy needed to run the IT equipment plus the energy needed to cool the facility, divided by just the energy needed for IT equipment. It is a measure of the efficiency of the site's cooling. For example, if the Power Usage Effectiveness (PUE) is 1.8x, it implies that the total energy used in the data center is 1.8 times (x) the energy used by the IT equipment, such as servers, storage devices, and switches. |
| link |
propertyUniqueId |
DCProperties* |
|
Unique identifier of data center property |
|
quarter |
long(1,4)* |
|
Numeric representation of the quarters of the year. Period from Jan 1 to Mar 31 is represented as 1, between Apr 1 to Jun 30 is denoted represented as 2; between Jul 1 and Sep 30 is represented as 3 and period between Oct 1 and Dec 31 is represented by 4. |
|
renewableEnergyPercentage |
decimal{5,2} |
|
Estimate of how much percentage (%) of energy for the data center comes from renewable sources |
|
roomToExpand |
boolean |
|
Indicates that the data center has available internal space within the existing building that can be used for future expansion. |
|
squareFeetPerRack |
decimal{10,4} |
|
Average white space (built-out, operational square footage) a rack takes up in a data center, in square feet. |
|
totalITEquipmentSpace |
decimal{13,4} |
|
Currently built-out data center space that can support customer equipment ("white space" or "raised floor"), in square feet (sq. ft). This does not include offices, common areas, mechanical or electrical rooms. |
|
totalITPower |
decimal{10,4} |
|
Installed power available for client IT equipment, in kW (kilowatts). |
|
totalITPowerAllocated |
decimal{10,4} |
|
Total UPS power being rented or leased by clients, in kW ( kilowatts). |
|
totalITPowerAvailable |
decimal{10,4} |
|
Total UPS power available to be rented or leased by clients, in kW (kilowatts). |
|
totalITPowerPercentAllocated |
decimal{5,2} |
|
Percentage (%) of total UPS power that is being rented or leased. |
|
totalITSpaceAvailable |
decimal{12,4} |
|
Total operational space still available to be rented or leased by clients, in square feet (sq. ft). |
|
totalITSpaceOccupied |
decimal{13,4} |
|
Total operational space in square feet (sq. ft) being rented or leased by clients. |
|
totalITSpacePercentOccupied |
decimal{5,2} |
|
Percentage (%) of total operational space that is being rented or leased by clients. |
|
totalRacks |
long(0,99999999) |
|
Actual number of racks that could be or are installed in the built-out space in the data center. |
|
totalRacksAvailable |
long(0,99999999) |
|
Actual number of racks that could be or are installed that are still available to be rented or leased by clients. |
|
totalRacksOccupied |
long(0,99999999) |
|
Actual number of racks that are currently rented or leased by clients. |
|
totalRacksPercentOccupied |
decimal{5,2} |
|
Percentage (%) of total racks that are being rented or leased. |
|
totalUtilityPower |
decimal{13,4} |
|
Power supplied to the building by the electrical utility, in kW (kilowatts). For example, if the IT equipment requires 500kW of power and the PUE is 1.5, another 250kW of power is required for cooling and utility power must be at least 750kW. |
|
wattPerSquareFoot |
decimal{10,4} |
|
The amount of electrical power capacity (in watts) allocated or available per square foot of data center operational space. |
|
year |
long(1800,3000)* |
|
Numeric representation of a year. |